午夜伦理影院,美女100%视频免费观看,午夜肉伦伦 Installation of Braided Packing

亚洲一区在线播放-久久视频精品-青青草视频免费观看-国产精品91在线-熟妇人妻中文av无码-日本高清免费视频-国产99精品视频-天海翼av在线-少妇媚药按摩中文字幕-在线观看a级片-婷婷午夜激情-亚洲天堂女人-国产一区二区女内射-俺来也最新网址-视频在线观看91

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Verion 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installation of Braided Packing

Packing the Pump Correctly:
The importance of packing the pump correctly cannot be overemphasized. Many packing failures are due to the incorrect installation of the packing. The following steps have been  devised to ensure effective installation of packings on pumps.

1. Remove all the old packing from the stuffing box.
Clean box and shaft thoroughly and examine shaft sleeve for wear and scoring. Replace shaft sleeve in wear is excessive.

2. Choosing the correct cross-section of packing.
To determine the correct ring size:
A. Measure the diameter of the shaft (inside the stuffing box area, if possible.)
B. Measure the diameter of the stuffing box (to give the O.D. of the ring.)
C. Subtract the I.D. measurement from the O.D., measure and divide by two. The result is the required cross section.

3. Cutting packing into rings.
Figure 1: Hold the packing tightly on the mandrel, but do not stretch excessively, and cut the ring(s).

The best way to cut packing rings is to cut them on the mandrel with the same diameter as the shaft in the stuffing box. If there is no wear, rings can be cut on the shaft outside the stuffing box.Insert one ring at a time into the stuffing box, making certain it fits the packing space properly. Each additional ring can be cut in the same manner, or the first ring can be used as a master from which the balance of the rings are cut.If the Butt Cut rings are cut on a flat surface, be certain that the side of the master rings, and not the I.D. or O.D. surface, is laid on the rings to be cut. This is necessary so that the end rings can be reproduced.When cutting Skive, diagonal joints, use a maple miter board so that each successive ring can be cut at the correct angle.

It is necessary that rings be cut to the correct size. Otherwise, service life is reduced.

4. Install one ring at a time. Make sure the packing ring is clean and has not picked up any dirt in handling. If needed, lubricate the shaft and inside of the stuffing box.

Packing rings should be firmly seated in the stuffing box one at a time using a tamping tool...>>Next Page

 

[1]

[2] NEXT Total 2 Page 1/2
浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn