久久久久久久久久久久久久,91九色在线观看,午夜神马福利 Installing Grafoil Crinkle Gasket Tape

亚洲一区在线播放-久久视频精品-青青草视频免费观看-国产精品91在线-熟妇人妻中文av无码-日本高清免费视频-国产99精品视频-天海翼av在线-少妇媚药按摩中文字幕-在线观看a级片-婷婷午夜激情-亚洲天堂女人-国产一区二区女内射-俺来也最新网址-视频在线观看91

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installing Grafoil Crinkle Gasket Tape

1. Brush off any rust or foreign particles. Wipe flange surface thoroughly with a rag soaked in acetone or other suitable solvent to remove grease or oil.

2. Insert fingernail between the paper backing strip and the tape and strip the paper back three to six inches. Draw a reference line in flange and press squared off end of tape against it.

3. Now, start laying the tape along the face of the flange, peeling the paper backing as you go. To prevent the adhesive surfaces of the tape from doubling back on themselves and sticking together, strip away only a few inches of paper at a time.

4. When the starting point has been reached, lap the tape not more than 1/16 inch and cut with a sharp blade.

5. If wrinkles appear because of improper installation, the may be rolled out with a length of pipe.

For Multiple Thickness Gasket, Add Steps 6, 7 and 8

6. When the starting point has been reached, do not cut the tape. Roll out the tape already laid down using a short length of smooth pipe to iron out the wrinkles.

7. Now, repeat step 3. Be sure that the top layer is positioned exactly above the first layer before contact is made. Once the adhesive touches the tape, it is impossible to separate the layers without tearing them.

8. Repeat steps 6 and 7, depending on the number of layers of tape to be laid down. Finish with steps 4 and 5.

>>The End>>

浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn